Over 300 security guards performed a load test on a new foot overbridge. Engineers inspected the bridge for structural integrity and signs of corrosion. The 91-foot-long bridge will carry thousands of devotees to the Nagchandreshwar temple. Authorities recommend a maximum of 300 devotees use the bridge simultaneously. The bridge was constructed in 2022 and passed its recent safety inspection.
Top Stories
300 guards jump in unison to test Mahakaleshwar temple bridge before Nag Panchami
- by The News Vista
- August 17, 2026
- 0 Comments
- Less than a minute
- 8 Views
- 1 month ago

