Categories: Blog

Heavy rain triggers landslide near Kwar power project site, blocks Doda-Kishtwar highway

Heavy rainfall caused a major landslide near the Kwar hydroelectric project in Kishtwar. Flash floods and mudslides blocked the Kishtwar-Doda Highway, burying several vehicles under debris. Large volumes of mud and boulders entered the project site, damaging construction equipment and materials. Three gates of the Baglihar dam were opened as the Chenab river water level increased significantly. District administrations in Doda and Kishtwar are monitoring weather conditions and river flow.

The News Vista

Share
Published by
The News Vista

Recent Posts

Hydel project shutdown triggers power crisis in J&K

The prolonged shutdown has widened the region’s power deficit. Jammu & Kashmir’s peak electricity demand…

2 hours ago

8 terror suspects held in Kashmir; arms-ammo, posters seized

Six arrests were made in south Kashmir’s Shopian district and two in Pulwama, also in…

2 hours ago

World’s first mobile phone call: Cooper dials rival on New York City street

Dr Martin Cooper made the first mobile phone call on April 3, 1973. He called…

2 hours ago

Dolly Parton, legendary country singer and songwriter, dies at 80

Born on January 19, 1946, in Tennessee, Parton grew up in a poor family and…

2 hours ago

SCORM in WordPress: What It Is, Who Needs It, and Your Options

SCORM explained in plain words: what it is, who actually needs it, and how to…

2 hours ago